OUR PROJECTS
Major Bridges
For more information on the services offered by MPA Engineering, or to request a quote, please contact us.
Preliminary Design, Detailed Design, Construction Supervision and Post Construction Services for Bridge File 09903 over Wolf Creek on Township Road 534 near Edson
Preliminary Design, Detailed Design, Construction Supervision and Post Construction Services for Bridge File 76041 over Chalmers Creek on Highway 33 North of Swan Hills
Construction Supervision and Post Construction Services for Bridge File 76474 over the Smoky River on Highway 40 North of Grande Cache
Preliminary Design, Detailed Design, Construction Supervision and Post Construction Services for Pierre Grey’s Pedestrian Bridge (Bridge File 86155) South of Grande Cache
The previous bridge at this location had reached the end of its service life, was hydraulically inadequate and required replacement. MPA completed the bridge planning and geometric design for the new bridge structure and 600 m of gradeline revisions to tie into the new deck height which increased by 3 m over the old structure.
For more information on the services offered by MPA Engineering, or to request a quote, please contact us.